All Issue

2026 Vol.14, Issue 2 Preview Page
30 June 2026. pp. 77-87
Abstract
References
1

L. Bird, D. Lew, M. Milligan, E. M. Carlini, A. Estanqueiro, F. Loew, E. Gomez-Lazaro, “Wind and solar energy curtailment: Experience and best practice” (IEA TCP Wind Technical Report, 12, National Renewable Energy Laboratory, 2016).

2

International Energy Agency (IEA), “Integrating solar and wind: Global experience and emerging challenges” (IEA Publications, 14, IEA, 2024).

3

International Renewable Energy Agency (IRENA), “Renewable energy highlights, July 2025” (Statistical Bulletin, 2, IRENA, 2025).

4

EPEX Spot, “15-minute contracts successfully launched on German Intraday market”, EPEX Spot News, Paris, EPEX Spot SE (2011).

5

C. Koch, L. Hirth, Short-term electricity trading for system balancing: An empirical analysis of the role of intraday trading in balancing Germany’s electricity system. Energy Econ. 75, 395-406 (2019).

10.2139/ssrn.3284262
6

Korea Power Exchange, “Jeju Real-Time Market Pilot Program Operation Guidelines” (Jeju Market Guidelines, 7, Korea Power Exchange, 2024).

7

Ministry of Trade, Industry and Energy, “The 10th Basic Plan for Long-term Electricity Supply and Demand”, 10th Basic Plan, 33, Ministry of Trade, Industry and Energy (2023).

8

International Renewable Energy Agency (IRENA), Tripling renewable power by 2030: Enabling faster deployment (Policy Brief, 10, IRENA (2023).

9

C. Lee, J. Kwon, J. Kim, Feasibility assessment of a battery energy storage system for integrating renewable energy on an island with high penetration. Energies 13(22), 6082 (2020).

10

M.-S. Choi, T.-W. Kim, J.-H. Park, A study on the utilization plan of power storage and P2H for preventing renewable output restriction in Jeju region. J. Korean Inst. Electr. Eng. 71(12), 1879-1886 (2022).

11

S.-W. Yoon, D.-E. Jung, S.-J. Han, Priority analysis for the operation of flexible resources for variable renewable energy in Jeju using AHP. J. Korean Inst. Electr. Eng. 73(6), 1008-1009 (2024).

12

S. R. Dabbagh, M. K. Sheikh-El-Eslami, Risk assessment of virtual power plants offering in energy and reserve markets. IEEE Trans. Power Syst. 31(5), 3572-3582 (2016).

10.1109/TPWRS.2015.2493182
13

H. D. Nguyen, N. H. Nguyen, Optimal reserve and energy scheduling for a virtual power plant considering reserve activation probability. Appl. Sci. 11(21), 9717 (2021).

10.3390/app11209717
14

J. Lee, D. Won, Optimal operation strategy of virtual power plant considering real-time dispatch uncertainty of distributed energy resource aggregation. IEEE Access 9, 56965-56983 (2021).

10.1109/ACCESS.2021.3072550
15

N. Naval, J. M. Yusta, Virtual power plant models and electricity markets - A review. Renew. Sustain. Energy Rev. 149, 111393 (2021).

10.1016/j.rser.2021.111393
16

H. Pandžić, I. Kuzle, Virtual power plant mid-term dispatch optimization. Appl. Energy 101, 134-141 (2013).

10.1016/j.apenergy.2012.05.039
17

P. Denholm, M. O'Connell, G. Brinkman, J. Jorgenson, “Overgeneration from solar energy in California: A field guide to the duck chart” (NREL Technical Report, 12, National Renewable Energy Laboratory, 2015).

10.2172/1226167
18

A. Mills, R. Wiser, Strategies to mitigate declines in the economic value of wind and solar at high penetration in California. Appl. Energy 147, 269-278 (2015).

10.1016/j.apenergy.2015.03.014
19

California Independent System Operator (CAISO), “What the duck curve tells us about managing a green grid”, CAISO Fast Facts, 2, California ISO, (2016).

20

S. Zhang, J. Li, Y. Wang, What is driving the remarkable decline of wind and solar power curtailment in China?. Renew. Energy 174, 31-43 (2021).

10.1016/j.renene.2021.04.043
21

D. W. Hosmer, S. Lemeshow, R. X. Sturdivant, Applied Logistic Regression (John Wiley & Sons, Hoboken, NJ, 2013), pp. 1-35.

10.1002/9781118548387
Information
  • Publisher :Korea Photovoltaic Society
  • Publisher(Ko) :한국태양광발전학회
  • Journal Title :Current Photovoltaic Research
  • Volume : 14
  • No :2
  • Pages :77-87
  • Received Date : 2025-11-23
  • Revised Date : 2026-01-14
  • Accepted Date : 2026-01-20