Abstract
References
Sorry, not available.
Click the PDF button.
Information
The growing demand for new energy infrastructure has often been encountered with the difficulties of siting in power plants and electric transmission lines. Siting such large-scale and complex facilities produces so many-sided issues that it is highly necessary to develop an approach to resolving the related problems and conflicts. This paper introduces how the stakeholders have handled the issues and resolved conflicts with residents opposed the construction of 765 kV transmission line. The solar photovoltaic power generation, called “Hee-Mang Sunlight Power project”, is used for persuading residents to agree with constructing high-voltage transmission line and sharing benefits. It is considered how the project performance such as generation output and resident’s profits is and proposed what the project should be revised and supplement. The project is shown that the intractable spiting in energy systems can be smartly resolved with cost-effective institutional solutions instead of relatively expensive technical ones.
Click the PDF button.
- Publisher :Korea Photovoltaic Society
- Publisher(Ko) :한국태양광발전학회
- Journal Title :Current Photovoltaic Research
- Volume : 8
- No :3
- Pages :79~85


Current Photovoltaic Research






