All Issue

2025 Vol.13, Issue 4 Preview Page
31 December 2025. pp. 179-191
Abstract
References
1

Ministry of Trade, Industry and Energy (MOTIE), The 11th Basic Plan for Long-Term Electricity Supply and Demand (2024).

2

WWF Korea, Corporate Renewable Energy Activation through Planned Siting (COREI) Research, Sept. 8 (2025). https://www.wwfkorea.or.kr/data/file/korean_report/1794572195_0LMlvW8U_09fde12358c6ed0e1b40f6f1b5b9a747a360d0eb.pdf

3

Y. J. Lee, J. C. Kim, S. C. Lee, Changes in Renewable Energy Use and the Status of RE100, Journal of energy & climate change, 14, 65-73 (2019).

4

J. H. Oh, Price Comparison and Policy Direction for Expanding RE100 in Korea, Master’s Thesis, Seoul Natl. Univ. of Sci. & Technol. (2021).

5

Korea Development Bank (KDB), Issues and Responses to Renewable Energy Output Curtailment in Korea (2023).

6

Korea Energy Economics Institute (KEEI), World Energy Market Insight, Issue 23-21 (2023).

7

G. H. Jeong, Implications for Designing Compensation Criteria for Renewable Energy Curtailment, Proc. Korean Inst. Electr. Eng., June 4 (2021).

8

J. A. Noh, T. W. Kim, T. Y. Kim, K. W. Seo, J. H. Kook, J. W. Park, Study on streategies to mitigate renewable energy curtailment. Korean Inst. Electr. Eng. July (2024).

9

D. H. Kim, Effect analysis of PPA settlement schemes for corporate RE100 achievement in Korea (2024).

10

Y. J. Jung, K. S. Park, Study on Time-of-Use Electricity Tariff Reform, Korea Energy Economics Institute, Policy Issue Paper 19-03 (2019).

11

M. Milligan, B. Kirby, Combining balancing areas’ variability: Impacts on wind integration in the Western Interconnection, NREL/CP-550-48249, Natl. Renewable Energy Lab. (2010).

12

A. D. Mills, R. Wiser, J. Seel, Impacts of variable renewable energy on wholesale markets and generating assets in the United States: A review of expectations and evidence, Lawrence Berkeley Natl. Lab. (2019).

10.1016/j.rser.2019.109670
13

G. H. Jeong, Implications for designing compensation criteria for renewable energy curtailment. Proc. Korean Inst. Electr. Eng., June 4 (2021).

14

Y. R. Kim, Judicial perspectives on renewable energy curtailment actions. Korean Inst. Electr. Eng. Bull., May (2025).

15

S. W. Hwang, Economic evaluation through comparative analysis of energy output by module tilt angle in fixed solar PV systems. Master’s Thesis, Hanyang Univ., Aug. (2021).

16

C. H. Moon, B. S. Kwon, S. H. Woo, D. J. Bae, K. B. Song, Economic Evaluation and Sensitivity Analysis of Solar PV Generation Business from the Perspective of Solar PV Generation Owners according to Fluctuation Scenarios of SMP and the Price of REC. Journal of the Korean Institute of Illuminating and Electrical Installation Engineers(JIEIE) 34(10) 36-44 (2020).

10.5207/JIEIE.2020.34.10.036
17

K. H. Kim, Study on Design and Site Selection Methods for MW-Scale Large Solar Power Plants. Master’s Thesis, Hanyang Univ., Aug. (2018).

18

J. A. Noh, S. M. Lee, D. H. Choi, S. M. Baek, J. W. Park, Overseas Cases Survey on Renewable Energy Curtailment and Compensation, Korean Inst. Electr. Eng., July (2021).

19

D. G. Park, J. Y. Kim, A study on comparison and improvement of RE100 system. KIEE, 264-265 (2021).

20

H. Y. Shin, J. B. Park, Analysis of Global RE100 Operation Status and Suggestions for Expanding RE100 in South Korea. The transactions of the Korean institute of electrical engineers, 70, 1645-1654 (2021).

10.5370/KIEE.2021.70.11.1645
21

J. W. Lee, S. W. Kim, Cost Analysis on RE100 Implementation Strategies of Electricity Consuming Company for RE100 Achievement. NEXT Group WP 2021-01 (2021).

22

S. H. Ahn, Comparative Study on Implementation Plans for Achieving RE100 in Korea: Focus on Economic Analysis, Master’s Thesis, Korea Univ. (2022).

23

D. H. Kim, Effect Analysis of PPA Settlement Schemes for Corporate RE100 Achievement in Korea (2024).

24

S. H. Lee, J. S. Kim, Current Status and Challenges of PPA to Support RE100 Implementation for Domestic Corporates. Korean Society for New and Renewable Energy (KSNRE)., Busan, Republic of Korea (06. 2023).

25

Shin & Kim Law Firm, Regulation on Direct Power Trading by Renewable Energy Suppliers, 2022. Available online: https://www.shinkim.com/kor/media/newsletter/1894 (accessed on 17 October 2025).

26

H. K. Cho, Effects of Time-of-Use Transmission Tariff Differentiation on Direct Power Trading Contracts, Doctoral Thesis, Korea Univ. (2023).

27

T. Traber, C. Kemfert, Impacts of the German support for renewable energy on electricity prices, emissions, and firms. Energy J. 30(3), 155-178 (2009).

10.5547/ISSN0195-6574-EJ-Vol30-No3-8
28

J. Lipp, Lessons for effective renewable electricity policy from Denmark, Germany and the United Kingdom, Energy Policy 35(11), 5481-5495 (2007).

10.1016/j.enpol.2007.05.015
29

Capital Wizard, Overview and Structure of Project Financing (PF): Advantages and Disadvantages, Capital Wizard Blog, Apr. 2020. Available online: https://capitalwizard.tistory.com/13 (accessed on 17 October 2025).

30

Data Portal (Operated by the Ministry of the Interior and Safety), National Photovoltaic and Wind Power Curtailment Frequency and Jeju Wind Curtailment Volume, Available online: https://www.data.go.kr/data/15132422/fileData.do, 2025. (accessed on 29 May 2025).

31

Korea Power Exchange (KPX), Non-Centralized Output Curtailment Information, Available online: https://new.kpx.or.kr/board.es?mid=a10109050000&bid=0216, 2024. (accessed on 29 May 2025).

32

Korea Power Exchange (KPX). Electric Power Statistics Information System (EPSIS): Electricity selling price. Available online: https://epsis.kpx.or.kr/epsisnew/selectEksaScfChart.do?menuId=060600 (accessed on 26 October 2025).

33

Korea Employers Federation, Mitigation Measures for Industrial Electricity Tariff Burden to Strengthen Corporate Competitiveness, Mar. (2025).

34

Ministry of Data and Statistics (MDS), Consumer Price Index by Type of Commodity (2020=100), Available online: https://kosis.kr/statHtml/statHtml.do?orgId=101&tblId=DT_1J22002&conn_path=I3, 2025. (accessed on 6 September 2025).

35

Ministry of Trade, Industry and Energy (MOTIE), Guidelines for Operation of Renewable Energy Forecasting System (2023).

36

Qcells Korea. (2025). Product performance data and installation guidelines for photovoltaic modules. Retrieved October 26, 2025, from https://qcells.com/kr/get-support/download (accessed on 20 September 2025).

37

Korea Economic Daily, Industrial Electricity Price Surge: Corporations Seek Solutions through PPA, May 3 (2025). https://www.hankyung.com/article/202504091274i (accessed on 20 September 2025).

38

Shin & Kim LLC. (2022, December 28). Amendments to Electricity Market Operation Rules following the introduction of the SMP price cap system (Emergency Settlement Price Cap). Shin & Kim Newsletter. Available online: https://www.shinkim.com/kor/media/newsletter/1999 (accessed on 17 October 2025).

39

O. Andersson, What is the feasibility of using power purchase agreements as a green electricity sourcing method for a large industrial company?, Master’s Thesis, KTH Royal Inst. Technol. (2023).

40

P. Gabrielli, P. Hilsheimer, G. Sansavini, Storage power purchase agreements to enable the transition to net-zero electricity: An overview, Renew. Sustain. Energy Rev. 157, 112050 (2022).

10.1016/j.isci.2022.10470135874101PMC9304613
41

E. Elwakil, M. Hegab, Risk management for power purchase agreements, IEEE Conf. on Technologies for Sustainability (SusTech), Long Beach, CA, 1-6 (2018).

10.1109/SusTech.2018.8671337
Information
  • Publisher :Korea Photovoltaic Society
  • Publisher(Ko) :한국태양광발전학회
  • Journal Title :Current Photovoltaic Research
  • Volume : 13
  • No :4
  • Pages :179-191
  • Received Date : 2025-11-06
  • Revised Date : 2025-11-25
  • Accepted Date : 2025-11-27